New 12′ x 9′ Portable Building. Available Immediately for Sale or Hire

TITLE:New 12′ x 9′ Portable Building. Available Immediately for Sale or Hire
PRICE:£4,495 or hire £40 per week

Outline Specification

  • Plastic coated steel external finish
  • Steel external entrance door
  • Vinyl faced plasterboard lined ceiling and walls
  • Vinyl floor covering in grey
  • LED lighting
  • 2kw convector heating
  • 13 amp power points and an RCD Consumer Unit

Featured Case Study

Modular Car Hire Building For Airport

  We recently installed a two section modular building which is to be used as a car hire office at a local airport. The building was installed in just one day and completed over the next two days to the delight of our customer. The building consists of a reception area, three car hire offices

Read Details

Call us on 01482 656590 or Enquire Now

Read what our customers say

Modular Car Hire Building For Airport

  We recently installed a two section modular building which is to be used as a car hire office at a local airport. The building was installed in just one day and completed over the next two days to the delight of our customer. The building consists of a reception area, three car hire offices

Read More »

Double stacked jackleg cabins for a local company

We supply buildings throughout the UK, so it was nice when we were contacted by a local company just 4 miles away. F Smales & Son Ltd are a long established fish merchant in Kingston Upon Hull who required two portable buildings double stacked with an external steel staircase. The buildings were installed in just

Read More »

We also hire modular buildings

We have just provided a 10m x 6m new manufactured open plan modular building on hire, which is to be used as a training and induction facility. The building was installed onto Jackpad relocatable foundations pads in just one morning and fully completed with an external lower vermin skirt by the following day. Our client

Read More »

Another Delighted Customer

We were asked to quote for a two section modular training room which involved us utilising the relocatable jackpad foundations from an old modular building which was to be demolished. The building was delivered by a high-ab craned vehicle and from installation to completion took just one and a half days. Just a quick email

Read More »