Menu

We now accept credit and debit cards Visa Mastercard

01482 656590 Enquire now

Freight forwarding company delighted with their "building within a building"

Client:
JAG UFS
Project:
Offices linked in within the factory building
Facilities:
Three offices and a meeting room

I don’t often feel compelled to send emails, but honestly, Andy and his team were superb from start to finish. You have a grade “A” team and they should be recognised for this.

Gary Wilcox, CEO of JAG UFS GROUP

This company has recently found  new premises, but  required substantial extra office space. The company approached us to have a modular building connected onto their existing offices inside the actual factory itself. 

We offloaded the modules outside the factory, and using wheeled skids moved each module inside through the factory doors and then linked the building through to their main office. This is known in the trade as "getting your skates on"!

We have manufactured this two bay office structure for JAG to their exact bespoke specification. The building has three offices and a meeting room, each to the proportions required. 

We are adept at providing exactly the building our customers require. In this case it may have been a bit of a literal push (ha ha) and an "Inside job", but it's lovely to have satisfied clients.

 

Jag 1 Jag 3

‘I just wanted to email you and say thank you to your staff that installed the building. Nothing was too much trouble and I couldn’t be more pleased with the building.

 The crew that came down turned up on time, worked tirelessly and were great to have around. 

Andy was absolutely brilliant and helped make sure that I was happy at every stage. I don’t often feel compelled to send emails, but honestly, Andy and his team were superb from start to finish. You have a grade “A” team and they should be recognised for this.’

Gary Wilcox, CEO of JAG UFS GROUP

View all our case studies